NZ STEEL PLANT
PROJECT NAME
NZ Steel Plant
Value
$23,500,000
CLIENT
New Zealand Steel Ltd
COMPLETION
1983 – 1986
Dominion was engaged with other contractors on the New Zealand Steel Mill Expansion Project, both on the Stage I – Steel Plant and the Stage II – Hot Rolling Mill.
The company was directly involved in setting 54,000sq m and placing 29,000cu m of concrete to a wide variety of structures.
Constructed over a 600-acre site, these included:
- Many foundations and slabs
- Massive 10m-high machine bases
- Tunnels A 700sq m scale pit, 14m deep in the ground
- Two water treatment plants
- Cooling towers
The scale of the project required considerable co-ordination of staff and materials. Set out of the works was crucial and precision was vital for placing the numerous machine holding-down bolts to the exacting tolerances specified.